If you are conducting work on our network, be sure to review the following material:


Download Documents

Title Size Date
CEM8014.67 - Gross Metering Arrangement, Single Phase Installation (Optional Load Control) - Single Phase Grid Connected Inverter64KB05/01/10
CEM8014.68 - Gross metering Arrangement, Three Phase Installation (Optional Load Control) - Single Phase Grid Connected Inverter80KB05/01/10
CEM8014.69 - Gross Metering Arrangement, Three Phase Installation (Optional Load Control) - Multi Phase Grid Connected Inverter96KB05/01/10
CEOP8027 - Metering Services: Network Standard Metering218KB05/02/10
CEM7001 - Network Services:
Design Construction Drawings
4,602KB29/07/09
Electrical Safety Rules
Procedural Guideline
217KB17/06/08
Product notification 12
160AMP Switchfuse mount bracket for concrete poles.
63KB01/03/07
CEFD6496 - Creation of easements for services installed by level 2 accredited service providers23KB01/02/07
CEPG8079 - High Voltage Connection Requirements
These guidelines are designed to cover requirements that need to be satisfied to ensure Country Energy's minimum standards for HV Customer connection are met. This code of practice applies to all new major Electrical/Plant Equipment. Any enquiries should be directed to Networks Commercial on 13 23 56.
283KB30/09/08
CEPG9048 - Metering Services: EM5100 Polyphase Electronic Meter323KB09/03/09
CEK8058 - P1 Single Phase Electronic Meter Installation and Use122KB01/11/05
CEK8059 - Q4A Polyphase Electronic Meter Installation and Use164KB01/11/05
CEK8073 - CM170 Single Phase Induction Disc Meter Installation and Use85KB01/11/05

CEPG8048 - Enermet/Landis and Gyr RO3 Frequency Injection Receiver Installation and Use

501KB14/09/06
CEK8086 - ABB/Elster LCR212 Frequency Injection Receiver Installation and Use536KB26/05/05
CEOM8014.53 - EM1200 Series Single Phase Two Element Electronic Meters: Installation and Use430KB09/02/10
CEP2015 - General Terms and Conditions for the Supply of Electricity to New Subdivisions and Site Developments2,529KB04/02/05
Easement Requirements
A code of practice outlining why easements are required, when they are required and how they are created. Outlines what work can be done without easements providing Consent Forms are obtained.
482KB17/11/06
CEFD9091 - Designer's Advice That Proposed Easement Is Suitable56KB17/11/06
CEFD9096 - Solicitor's Undertaking That Easement Will Be Created19KB17/11/06
CEFD9090 - Solicitor's Advice That Easement Has Been Created15KB17/11/06
CEFD9082 - Consent Form - Customer Funded Project18KB17/11/06
CEFD9095 - Consent Form - Country Energy Funded Project17KB17/11/06
CEFD9093 - Consent Form - Schedule Of Works Required18KB17/11/06
CEFD9097 - Terms Of Easement For Overhead Powerlines19KB17/11/06
CEFD9098 - Terms Of Easement For Underground Powerlines19KB17/11/06
CEFD9099 - Terms Of Easement For Multi-purpose Electrical Installation19KB17/11/06
CEFD6010 - Design Information35KB04/02/05
CEFD6127 - Public Lighting: Installation and Connection Consent58KB12/01/09
CEFD6011 - Design Submission21KB04/02/05
Notification To Commence Construction30KB04/02/05
Outage/Connection Request43KB04/02/05
Completion Notice25KB04/02/05
Manual - CEOM7004
Contestability (Approved) materials inventory
332KB05/02/10
CEFD6030 - Approved Materials: Application Form117KB29/07/09
Project Safety and Environment Plan255KB05/12/06
CEFD6470 - Consultant Checklist for the Preparation of REF310KB30/01/09
CEFD6024 - Environmental Impact Assessment Checklist153KB21/12/09
Electricity Service and Installation RulesExternal LinkNA
CEFD6203 - Application for Authorisation: Contestable Work233KB28/09/09